PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing motorized dampers at the 4th floor Facing East.jpg Laying out block at Stair -3 Facing North.jpg Rebar at 1st floor concrete plank (1).jpg Burning steel plate at 4th floor Column line F-K Facing South-West.jpg Core drilled Stair -4 for the sprinkler main raiser Facing North.jpg Installed copper piping at the 3rd floor bathroom Facing North.jpg Installing motorized dampers at the 4th floor Facing East (2).jpg
Previous pageNext page Rebar at 1st floor concrete plank (1)
Rebar at 1st floor concrete plank (1)